Tianjin Tianyingtai Steel Pipe Co., Ltd. is one of the most credible manufacturers and suppliers of galvanized metal construction project perforated steel plank in China. Welcome to consult the quotation and import cheap galvanized metal construction project perforated steel plank made in China here from our factory.
galvanized metal construction project perforated steel plank
I.Product Basic Info:

| Classification | Description | Specification |
Theoretical Weight |
Material | Surface | Postscript |
| Steel Plank | Steel plank | 210x45x1.2x2000 | 6.72kg | Q195-Q355 | Pre-galvanized Hot-dip galvanized |
Plate Rib or Square Rib Thickness: 1.0-3.0mm Length: can be customized Hook: 43mm or 50mm |
| Steel plank | 240x45x1.2x2000 | 7.35kg | Q195-Q355 | |||
| Steel plank | 250x50x1.2x2000 | 7.74kg | Q195-Q355 | |||
| Double steel plank | 400x45x1.2x2000 | 12.95kg | Q195-Q355 | |||
| Double steel plank | 420x45x1.2x2000 | 13.37kg | Q195-Q355 | |||
| Double steel plank | 480x45x1.2x2000 | 14.67kg | Q195-Q355 | |||
| Double steel plank | 500x50x1.2x2000 | 15.45kg | Q195-Q355 | |||
| Cat Walk | Cat walk | 210x45x1.2x1829 | 5.9kg | Q195-Q355 |
Pre-galvanized Hot-dip galvanized |
|
| Cat walk | 250x50x1.2x1829 | 7.4kg | Q195-Q355 | |||
| Cat walk | 250x50x1.2x1829 | 7.8kg | Q195-Q355 | |||
| Double cat walk | 400x45x1.2x1829 | 12.35kg | Q195-Q355 | |||
| Double cat walk | 450x45x1.2x1829 | 12.7kg | Q195-Q355 | |||
| Double cat walk | 480x45x1.2x1829 | 13.4kg | Q195-Q355 | |||
| Double cat walk | 500x50x1.2x1829 | 14kg | Q195-Q355 |
![]() |
Advantages of steel plank: 1.durable & stable 2.good bearing capacity 3.low cost, high quality 4.Excellent security function 5.easy to assemble & dismantle 6.long durability, the working life can up to 5-8 years 7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |
|
Application of steel plank: 1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building. 2.Stamping holes are on the scaffolding plank to resist skidding for workers. 3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment. 4. Various size of scaffolding plank could be customed. |
![]() |

Key Features
Superior Corrosion Resistance: Galvanized coating provides long-term protection against rust and harsh weather conditions.
High Load-Bearing Capacity: Made from high-strength steel (Q235 / Q355) to withstand heavy construction loads.
Perforated Surface: Reduces weight, improves drainage, and enhances anti-slip performance.
Customizable Dimensions: Available in various lengths, widths, thicknesses, and hole patterns according to project needs.
International Standards: Compliant with EN 12811 and BS 1139 for scaffolding planks and working platforms.
Easy Installation: Designed for quick assembly with standard scaffolding systems or as standalone walkways.
Environmentally Friendly Galvanizing: Produced in accordance with modern environmental standards.
FAQ
Q1: What material are TYT galvanized perforated steel planks made of?
A: Our perforated steel planks are typically made of Q235 or Q355 carbon steel, with optional S235 / S355 grades for European standards. All materials are galvanized for corrosion protection.
Q2: Can you customize the size and hole pattern?
A: Yes. TYT can customize the length, width, thickness, hole shape, hole diameter, and hole arrangement according to your drawings or specific project requirements.
Q3: What is the maximum load capacity of your perforated steel planks?
A: Load capacity depends on the material, thickness, span, and support conditions. Generally, our standard 3-meter planks with 1.2–3.0 mm thickness are designed for scaffold walkway loads of 150–300 kg per square meter. Please contact our engineering team with your specific load requirements for a precise recommendation.
Q4: What standards do your perforated steel planks meet?
A: The planks are manufactured in accordance with EN 12811, BS 1139, and ASTM A653 where applicable. Zinc coating thickness complies with GB/T 13912 or ISO 1461 for hot-dip galvanizing.
Q5: What is the minimum order quantity (MOQ)?
A: The MOQ is negotiable and usually based on a 20-foot container. We can accommodate smaller trial orders, but the unit price may be higher. Please contact our sales team for a detailed quotation.
Q6: How long is the delivery time?
A: For standard sizes, delivery is typically 10–20 days after order confirmation. For customized sizes or larger quantities, delivery may take 25–30 days or more, depending on production schedule.
Q7: Can TYT provide third-party inspection reports?
A: Yes. We can arrange SGS, BV, or other third-party inspections upon request, and we also provide mill test certificates (MTC) with every shipment.
Hot Tags: galvanized metal construction project perforated steel plank, made in China, manufacturers, suppliers, Galvanized Scaffolding Prop, Power coated spanish prop, hot dipped galvanized steel props, Filp Lock Frame, Frame Scaffold, Cross Brace







