Product Details
Key Specifications/Special Features:
This kind of steel plank with imperial size are used in scaffolding system. The finish is hot dip galvanized with different sizes as the above table shows. Ringlock scaffold is a modular scaffold system, widely used for form-work supporting in construction of high buildings, flyovers, bridges, channels, common civil houses and more. Generally, ringlock scaffold system often includes vertical post, horizontal ledger, bay brace, board bracket. Besides, some scaffold accessories are also essential, such as steel planks, clamps, steel stairs, screw jack base and so on.
| Size (mm) | Weight(Kg) | Size (mm) | Weight(Kg) |
| 165×50×1.2×4000 | 12.5 | 225×38×1.2×2000 | 6.93 |
| 165×50×1.2×3000 | 9.5 | 230×60×1.2×2500 | 16.5 |
| 165×50×1.2×2000 | 6.38 | 240×45×1.2×4000 | 14.87 |
| 165×50×1.2×1000 | 3.3 | 240×45×1.2×3000 | 11.23 |
| 210×45×1.2×4000 | 13.6 | 240×45×1.2×2000 | 7.59 |
| 210×45×1.2×3000 | 10.26 | 240×45×1.2×1000 | 3.94 |
| 210×45×1.2×2000 | 6.93 | 250×50×1.2×4000 | 15.67 |
| 210×45×1.2×1000 | 3.59 | 250×50×1.2×3000 | 11.84 |
| 225×38×1.2×4000 | 13.6 | 250×50×1.2×2000 | 8 |
| 225×38×1.2×3000 | 10.26 | 250×50×1.2×1000 | 4.5 |
Primary Competitive Advantages:
Quality Approvals
Service
Small Orders Accepted
Brand-name Parts
Country of Origin
Form A
Packaging
Price
Main Export Markets:
Asia
Australasia
Central/South America
Eastern Europe
Mid East/Africa
North America
Western Europe
Payment Details:
Minimum Order:25 Tons (US)
Delivery Details:
FOB Port:Tianjin
FOB Range: US$ 565 per unit (Tons (US))
Lead Time: 15-20 days






