info@tytgg.com.cn    +8618522522113
Cont

Have any Questions?

+8618522522113

Jun 21, 2021

Production Line —— Packing

The last step is Packing:

 

In this part, we have the automatic packing system to pack the pipe into bundles which can save a lot of time. The packing speed is much faster than by manual and package much more tidy.

 

Mean while the bundle pieces also can be required.

Usually we pack each bundle with 6 steel packing belts to keep the package sturdy. Also each bundle ends has two slings strip which makes loading and unloading much easier. And considering that for some customers, pipe will be sailing on sea for a long time. We also have other protections. Like the PVC pretection.

 

About the production lines, we have made a very detailed introduction. 

Send Inquiry